Intelligent Cycles for a Purer World

Complete Membrane Process Packages
for Water Treatment & Resource Recovery

Membrane systems for water treatment, reuse & resource recovery — UF / NF / RO / STRO / DTRO process design, supply, integration and commissioning. Delivery scope follows the project boundary: single-scope packages (engineering consultation, equipment supply, system integration, commissioning & O&M, investment & construction), or a fully packaged delivery — including civil works where the client requires a single point of responsibility.

Scope of work

What we deliver

From technology selection to a commissioned, documented and serviced installation — process, equipment, controls and civil interface.

Process design

  • Technology selection & routing
  • Water / salt mass balance
  • Parameter ranges & design basis
  • Equipment sizing

Supply & integration

  • Membrane elements & modules
  • Skid / frame assembly
  • Pumps, valves, instrumentation
  • Control philosophy

Commissioning

  • Start-up & flux ramp-up
  • CIP protocol development
  • Performance baseline
  • Operator handover & training

Controls & instrumentation

  • Control cabinet & PLC / SCADA
  • Instrumentation & field wiring
  • Process interlock & permissives
  • Remote monitoring interface

Elements & brands

  • DuPont FilmTec
  • Toray
  • Hydranautics
  • Koch / other on request
Applications

Where our membrane systems are used

The principal duty types covered are listed below. Where your feed falls outside this list, please contact us — process selection will be assessed against your water analysis, including the reasoning and the limits of applicability.

MSW incineration leachate

High-salt, high-COD concentrate. DTRO / STRO minimization feeding evaporation, turning mixed brine into a saleable salt.

Phosphate chemical industry

Phosphogypsum leachate and phosphorus-bearing high-salt wastewater. Membrane concentration plus staged struvite / crystalline recovery.

Electroplating & surface treatment

Separation of metals from organics, membrane-based fractionation and concentration for reuse and recovery.

Water reuse — industrial & municipal

UF followed by staged RO, or MBR-based reuse trains. For semiconductor and PCB grades, two-pass RO with conductivity and TOC control.

Seawater & brackish water desalination

SWRO systems including borate and silica control, energy recovery units and antiscalant dosing — supplied as the membrane package within a BOT or EPC contract.

FGD wastewater / high-salt brine

Nanofiltration salt separation combined with high-pressure membrane concentration, converting hazardous-waste disposal into industrial salt.

Oil & gas flowback / produced water

High-hardness, high-salinity, oily wastewater. Softening pretreatment followed by membrane minimization.

MBR membrane systems

UF / NF flat-sheet or hollow-fibre modules, membrane racks, aeration piping and control integration. supplied and commissioned as a complete package.

Municipal drinking water plants

Ultrafiltration as the primary clarification barrier ahead of disinfection, and nanofiltration for hardness, colour and organic removal. We supply and commission the membrane trains — with process design, disinfection validation and compliance documentation support.

Point-of-use drinking water

RO elements and skids for building and community drinking water systems. Potable-water applications require certification to NSF/ANSI 61 & 372 or the applicable local standard — we supply certified elements and support the documentation package.

Design basis

How we set the parameters

Below are typical feed-water thresholds and design flux bands — industry reference ranges, not a template. Every proposal starts from a full water analysis and a mass balance, never from a copied layout.

ParameterTypical thresholdWhy it matters
SDI< 3 (DTRO may accept < 5)Decides whether UF pretreatment is required, and the fouling risk on elements
Turbidity< 1 NTU (higher tolerated by DTRO)Together with SDI, sets the pretreatment intensity
Free chlorine< 0.1 ppmPolyamide membranes are oxidised without dechlorination — permanent damage
Total hardnessReduced below ~100 mg/LHardness scaling forms a layer that chemical CIP will not remove
Reactive silicaReduced below ~20 mg/LCalcium silicate scale is effectively irreversible once formed
Design fluxRO 12–18 LMH | DTRO 8–12 LMH | UF 40–60 LMHSet conservatively for the fouling load — not pushed to the nominal maximum
RecoveryConventional RO 60–70%; DTRO above 80%Bounded by concentrate-side scaling and by the downstream evaporator load
ElementsDuPont FilmTec / Toray / Hydranautics / KochSelected against your feed analysis; brand can be specified
On cost, we give you the method — not a number. Evaporation dominates operating cost in most ZLD trains. MVR typically runs at 40–75 kWh/t depending on boiling-point rise, scaling tendency and plant scale; multi-effect evaporation is steam-driven (three-effect around 0.37–0.46 t steam per tonne of water) and is only competitive where surplus heat is available. How much you minimize in the membrane section therefore decides how much the evaporator carries. Unseparated mixed brine typically costs 3000–5000 CNY/t in hazardous-waste disposal; with NF separation you are selling industrial-grade salt instead. The two variables that matter most are feed composition and target recovery — fix those and the economics follow.
Commercial models

Commercial models

Delivery scope follows the project boundary — take a single segment (engineering consultation, equipment supply, system integration, commissioning & O&M, investment & construction), or the whole chain as a packaged delivery. Civil works can be included where the client requires a single point of responsibility.

Consultancy & design

  • Technology selection
  • Mass balance & design basis
  • Equipment sizing & datasheets
  • Technical review & training

Equipment package

  • Complete equipment supply
  • Installation guidance & commissioning
  • Training & service support

Investment & operation

  • BOT / BOO
  • F + EPC (finance + design, supply, construction)

Operation & maintenance

  • Plant operation under contract
  • Membrane performance tracking
  • Consumables & CIP management
  • Duty optimisation
Selected projects

Selected projects

Selected projects across two delivery models — membrane process subcontracting, and self-invested resource-recovery plants we build and operate ourselves. Both lines are delivered independently by us, under our own responsibility. Detailed duty figures are available on request.

Membrane process packages

Dazhou, Sichuan DTRO membrane system for a resin regeneration wastewater plant

Two-stage DTRO concentration; permeate meets reuse requirements.

Luoxi, Chongqing DTRO containerized system for fly-ash leachate recovery

Leachate concentration and volume reduction, with permeate returned to reuse.

Jiangsu Ultrafiltration membrane system design and fabrication

UF systems engineered against the client's feed analysis and duty.Equipment supply

Heavy-metal recovery — self-invested, built and operated

Jiangyin, Jiangsu Nickel wastewater treatment and recovery plant

Nickel recovered from wastewater as saleable plate, purity above 99%.Self-invested · BOO

Ji’an, Jiangxi Nickel recovery at an electroplating wastewater plant

Nickel plated out of wastewater as a product rather than disposed of as heavy-metal sludge.Self-invested · BOO

Scope & limits

What we deliver, and where civil works sit

Stating the interface up front is how EPC contractors and design institutes avoid wasting each other's time.

✓ Within our scope
  • Process design, parameter setting, mass balance
  • Membrane elements, modules, pumps and valves — selection and supply
  • Skid assembly, control cabinet, PLC / SCADA and instrumentation
  • Installation guidance, start-up, CIP protocol, operator training
  • Performance monitoring, replacement planning and operating support
  • Civil works can be undertaken where the client requires a single-point scope
◐ Civil works & interfaces
  • Civil works are normally the client’s or the EPC contractor’s scope
  • We can take on civil works when a single-point scope is required
  • Electrical and instrumentation are delivered with the process package

Why it is worth talking to us early

  • Parameters follow your water, not a template. Every scheme starts from a full analysis and a mass balance. Where a given feed proves unsuitable for membrane treatment, this is stated explicitly at the design stage, before quotation.
  • Limits are stated before quotation. Which feeds will not work, and where the process will reach its boundary, are addressed at the design stage rather than after commissioning.
  • Worldwide delivery. We travel for water sampling, commissioning and operating support. Project location is not a constraint — neither is language.
Contact

Get in touch

For an initial assessment, the following are most useful: quality reports for feed water, discharge and permeate, the treatment objective — reuse, compliance or zero liquid discharge, and an approximate flow rate. Where these are not yet available, preliminary discussion of the duty is still welcome.

Contact Mr. XuFounder / Technical Lead
Mobile +86 183 0284 7009 / +86 156 0164 7074
Email cyclixtech@qq.comPrimary channel for technical enquiries
WeChat Available on requestFor coordination with Chinese-speaking project teams
Company CyclixTech Co., Ltd.Chengdu, China

Documents we can provide

  • Process proposal with mass balance and design parameters
  • Equipment datasheets and skid drawings
  • Operating experience on comparable feeds
  • Start-up and cleaning documentation
On project documentation: process descriptions, operating records and performance data for the selected projects listed above are available on request. Please indicate the intended use when contacting us.